| 王新建.高寒地区冬期预制梁施工技术探讨[J].矿产勘查,2019,(11):2843-2849 |
| 高寒地区冬期预制梁施工技术探讨 |
| Application of prefabricated beam construction technology in alpine-cold region |
| 投稿时间:2019-09-15 |
| DOI: |
| 中文关键词: 高寒地区 冬期施工 预制梁 |
| 英文关键词: alpine-cold region, winter construction, precast beam |
| 基金项目: |
|
| 摘要点击次数: 3776 |
| 全文下载次数: 1843 |
| 中文摘要: |
| 冬期施工已不乏其例,但国内在高寒地区进行预制梁冬期施工的成功案例比较少。通过对青海省德令哈制梁场冬期制梁施工的总结,研究原材料、混凝土搅拌、混凝土灌注、梁体养护的加热和保温措施,提出了后期配套措施的保温等问题,获得了一套在高寒地区现场预制梁的冬期施工技术。 |
| 英文摘要: |
| There are many cases of winter construction, but there are not many successful cases of winter construction of prefabricated beams in alpine-cold region. Based on the summary of the winter beam-making construction in Delingha Beam-making Works, this paper studies the heating and heat preservation measures of raw materials, concrete mixing, concrete pouring and beam body maintenance, puts forward the heat preservation problems of the later supporting measures, and obtains a set of winter construction technology of field prefabricated beams in alpine-cold region. |
|
查看全文
查看/发表评论 下载PDF阅读器 |
| 关闭 |
|
|
|